Second-Storey Additions
Adding a floor above a bungalow or garage? The new floor slab — formed, shored and poured over the existing structure — is the heart of the job.
Second-storey additions, elevated floors, mezzanines, balconies and decks-over-garages — poured on site with engineered shoring and conventional forms. No precast constraints, no geometry we can’t build. Engineered, documented, and built as drawn.

Precast panels are great when the site, crane and geometry line up. When they don’t — which is most renovation sites in Halton — an in-place pour with conventional formwork wins:

Our core suspended-slab method is conventional, reusable formwork — stripped and gone when the slab is cured. But when the design wants an insulated elevated assembly — an addition floor over a garage, a walk-out deck, or a low-rise roof deck — we also install InsulDeck®, an insulated concrete form system for floors, roofs and elevated slabs that stays in place after the pour as insulation, utility chase space and finish backing.
System details above are from the InsulDeck® manufacturer’s site. Ontario availability and engineered assemblies are confirmed for each project before quoting.
Adding a floor above a bungalow or garage? The new floor slab — formed, shored and poured over the existing structure — is the heart of the job.
Mezzanine slabs, garage roofs you can walk on, amenity decks and low-rise commercial floors poured in place with the right camber and drainage falls.
Cantilevered and supported balconies and deck slabs — see our dedicated concrete decks page for outdoor-living versions.
Concrete Decks →A suspended slab only works if the temporary structure under it is designed as carefully as the slab itself. Here’s what happens on every elevated pour:
A P.Eng. provides (or reviews) the shoring layout: member sizes, spacing, bracing and load paths for the fresh-concrete load. We build to that drawing — not to “what usually works”.
Formwork and rebar are inspected before concrete arrives. Rebar mats, chairs, splices and embeds are photographed for the record.
Slump tests, vibration, screeding to level, then a cure regime that follows the engineer’s schedule — never rushed.
Shoring stays until the engineer’s stripping criteria are met. We manage the calendar so your trades aren’t held up — safely.

Garage under, living space above — a classic Halton renovation. We form and shore the slab between the garage and the new floor, keep the garage usable through the pour, and hand over a slab that’s level, crack-controlled and ready for framing or finishes.
Add a reliable structural-concrete subtrade with WSIB, insurance and a QA pack on every job. We quote fast and hold schedules.
Trade Program →Adding a second storey or a slab where nothing was? We take the structural worry off your plate — permits, engineer and pour handled.
Get a Quote →Design-assist early: we flag forming, access and sequencing constraints while drawings can still change cheaply.